451
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Frozen fruit, juice, and vegetable manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| SF0554 #01 Y:2020 | 01 | 2020 | Reduce the pressure of compressed air to the minimum required | $427 | $80 | |
| UF0539 #06 Y:2019 | 06 | 2019 | Install an uninteruptable power supply | $44,758 | $3,326 | |
| UF0539 #05 Y:2019 | 05 | 2019 | Install occupancy sensors | $1,002 | $3,662 | |
| UF0539 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $4,250 | $11,853 | |
| UF0539 #03 Y:2019 | 03 | 2019 | Insulate glazing, walls, ceilings, and roofs | $4,651 | $11,760 | |
| UF0539 #02 Y:2019 | 02 | 2019 | Install desiccant humidity control system | $6,161 | $518 | |
| UF0539 #01 Y:2019 | 01 | 2019 | Use solar heat to make electricty | $38,262 | $166,880 | |
| BS0130 #06 Y:2019 | 06 | 2019 | Modify refrigeration system to operate at a lower pressure | $28,587 | $13,000 | |
| BS0130 #05 Y:2019 | 05 | 2019 | Utilize higher efficiency lamps and/or ballasts | $7,547 | $14,646 | |
| BS0130 #04 Y:2019 | 04 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,199 | $1,230 | |
| BS0130 #03 Y:2019 | 03 | 2019 | Install occupancy sensors | $131 | $180 | |
| BS0130 #02 Y:2019 | 02 | 2019 | Utilize energy-efficient belts and other improved mechanisms | $141 | $38 | |
| BS0130 #01 Y:2019 | 01 | 2019 | Insulate bare equipment | $395 | $1,259 | |
| BS0128 #05 Y:2019 | 05 | 2019 | Install compressor air intakes in coolest locations | $3,574 | $466 | |
| BS0128 #04 Y:2019 | 04 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,819 | $308 | |
| BS0128 #03 Y:2019 | 03 | 2019 | Upgrade controls on compressors | $5,952 | $1,038 | |
| BS0128 #02 Y:2019 | 02 | 2019 | Repair or replace steam traps | $4,088 | $5,932 | |
| BS0128 #01 Y:2019 | 01 | 2019 | Use waste heat from hot flue gases to preheat | $341,674 | $103,307 | |
| MI0356 #10 Y:2019 | 10 | 2019 | Optimize plant power factor | $7,059 | $11,855 | |
| MI0356 #09 Y:2019 | 09 | 2019 | Use solar heat to heat water | $7,502 | $13,650 |