ITAC Assessment: UF0539
ITAC logo
ITAC Assessment: UF0539
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Berries Processing
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $5
M
to 10
M
# of Employees 115
Plant Area 125,000
ft2
Annual Production 8,000,000
units
Production Hrs. Annual 4,680
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,831 879,500
kWh
Electricity Fees $10,946 -
TOTAL YEARLY COSTS $117,777
RECOMMENDED SAVINGS* $99,084 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $49,675

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Ancillary Material Cost Savings
01 2.9114: Use solar heat to make electricty $38,262 $166,880 $38,262
316,217
kWh
-
02 2.7273: Install desiccant humidity control system $6,161 $518 $6,161
50,918
kWh
-
03 2.7491: Insulate glazing, walls, ceilings, and roofs $4,651 $11,760 $4,651
38,434
kWh
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,250 $11,853 $4,250
35,127
kWh
-
05 2.7135: Install occupancy sensors $1,002 $3,662 $1,002
8,279
kWh
-
06 4.631: Install an uninteruptable power supply $44,758 $3,326 $(-242.0)
(-2,000)
kWh
$45,000
TOTAL RECOMMENDED $99,084 $197,999 $54,084
446,975
kWh
$45,000
TOTAL IMPLEMENTED $49,675 $182,913 $49,675
410,541
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs