ITAC Assessment: BS0128
ITAC logo
ITAC Assessment: BS0128
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Frozen Potato Products
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 185
Plant Area 282,000
ft2
Annual Production 400,000,000
lb
Production Hrs. Annual 7,992
hrs
Location (State) Idaho

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,237,684 27,921,678
kWh
Electricity Demand $332,663 51,063
kW-mo/yr
Electricity Fees $1,954 -
Natural Gas $5,890,814 1,283,687
MMBtu
TOTAL YEARLY COSTS $7,463,115
RECOMMENDED SAVINGS* $357,107 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.2414: Use waste heat from hot flue gases to preheat $341,674 $103,307 - - $341,674
-
MMBtu
02 2.2113: Repair or replace steam traps $4,088 $5,932 - - $4,088
-
MMBtu
03 2.4224: Upgrade controls on compressors $5,952 $1,038 $5,952
134,265
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,819 $308 $1,514
34,164
kWh
$305
-
kW-mo/yr
-
05 2.4221: Install compressor air intakes in coolest locations $3,574 $466 $2,480
55,944
kWh
$1,094
-
kW-mo/yr
-
TOTAL RECOMMENDED $357,107 $111,051 $9,946
224,373
kWh
$1,399
-
kW-mo/yr
$345,762
-
MMBtu
TOTAL IMPLEMENTED - - - - -