Assessment Year | 2020 |
---|---|
Principal Product | Frozen Bell Peppers |
NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
150,000
ft2
|
Annual Production | 90,000,000
lb
|
Production Hrs. Annual | 1,792
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $601,230 | 8,157,700 |
kWh
|
$0.074 |
Electricity Demand | $340,736 | 19,164 |
kW-mo/yr
|
$17.78 |
Natural Gas | $109,671 | 14,329 |
MMBtu
|
$7.65 |
TOTAL YEARLY COSTS | $1,051,637 | |||
RECOMMENDED SAVINGS* | $43,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,380 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4231: Reduce the pressure of compressed air to the minimum required | $427 | $80 |
$310
4,201
kWh
|
$117
-
kW-mo/yr
|
- | - | - | |
02 | 2.2192: Use heat exchange fluids instead of steam in pipeline tracing systems | $21,879 | $20,311 | - | - |
$21,879
-
MMBtu
|
- | - | |
03 | 2.2511: Insulate bare equipment | $386 | $404 | - | - |
$386
-
MMBtu
|
- | - | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,802 | $5,638 |
$4,802
65,149
kWh
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,099 | $13,511 |
$6,538
88,710
kWh
|
$3,219
-
kW-mo/yr
|
- | $260 | $82 | |
06 | 2.2511: Insulate bare equipment | $1,140 | $1,577 | - | - |
$1,140
-
MMBtu
|
- | - | |
07 | 2.3132: Recharge batteries on during off-peak demand periods | $871 | $1,184 | - |
$871
-
kW-mo/yr
|
- | - | - | |
08 | 2.4231: Reduce the pressure of compressed air to the minimum required | $833 | $1,245 |
$833
11,303
kWh
|
- | - | - | - | |
09 | 2.4324: Replace hydraulic / pneumatic equipment with electric equipment | $632 | $1,312 |
$411
5,573
kWh
|
$221
-
kW-mo/yr
|
- | - | - | |
10 | 2.7447: Install vinyl strip / high speed / air curtain doors | $2,351 | $5,888 |
$2,351
31,894
kWh
|
- | - | - | - | |
TOTAL RECOMMENDED | $43,420 | $51,150 |
$15,245
206,830
kWh
|
$4,428
-
kW-mo/yr
|
$23,405
-
MMBtu
|
$260 | $82 | ||
TOTAL IMPLEMENTED | $14,380 | $21,975 |
$9,610
130,378
kWh
|
$4,428
-
kW-mo/yr
|
- | $260 | $82 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs