ITAC Assessment: UM0333
ITAC logo
ITAC Assessment: UM0333
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Anodizing and Hardcoating
NAICS 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring
SIC 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 65,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $505,313 8,874,808
kWh
Electricity Demand $110,506 24,784
kW-mo/yr
Electricity Fees $9,143 -
Natural Gas $221,227 22,381
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,206 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,568

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $19,901 $2,000 - - $19,901
-
MMBtu
02 2.2414: Use waste heat from hot flue gases to preheat $8,803 $50,000 - - $8,803
-
MMBtu
03 2.7314: Reduce ventilation air $8,623 $100 - - $8,623
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,589 $3,480 $4,127
72,472
kWh
$462
-
kW-mo/yr
-
05 2.5194: Redesign process $2,329 $3,480 $857
12,343
kWh
- $1,472
-
MMBtu
06 2.2437: Recover waste heat from equipment $1,506 $1,060 - - $1,506
-
MMBtu
07 2.4221: Install compressor air intakes in coolest locations $1,455 $100 $1,312
23,045
kWh
$143
-
kW-mo/yr
-
TOTAL RECOMMENDED $47,206 $60,220 $6,296
107,860
kWh
$605
-
kW-mo/yr
$40,305
-
MMBtu
TOTAL IMPLEMENTED $34,568 $5,680 $5,439
95,517
kWh
$605
-
kW-mo/yr
$28,524
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs