Assessment Year | 2016 |
---|---|
Principal Product | Digital Printing |
NAICS | 323111: Commercial Printing (except Screen and Books) |
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 300 |
Plant Area |
225,000
ft2
|
Annual Production | 800,000
units
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $536,865 | 10,306,095 |
kWh
|
$0.052 |
Electricity Demand | $127,157 | 18,860 |
kW-mo/yr
|
$6.74 |
Electricity Fees | $110,149 | - |
|
- |
Natural Gas | $50,116 | 12,556 |
MMBtu
|
$3.99 |
TOTAL YEARLY COSTS | $824,287 | |||
RECOMMENDED SAVINGS* | $33,394 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $8,577 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,577 | $1,680 |
$7,262
139,385
kWh
|
$1,315
-
kW-mo/yr
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $7,507 | - |
$6,556
125,837
kWh
|
$951
-
kW-mo/yr
|
- | |
03 | 2.2437: Recover waste heat from equipment | $5,944 | $2,280 | - | - |
$5,944
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,581 | $12,490 |
$5,581
107,121
kWh
|
- | - | |
05 | 2.4221: Install compressor air intakes in coolest locations | $5,192 | $2,750 |
$4,396
84,370
kWh
|
$796
-
kW-mo/yr
|
- | |
06 | 2.7135: Install occupancy sensors | $593 | $1,400 |
$593
11,383
kWh
|
- | - | |
TOTAL RECOMMENDED | $33,394 | $20,600 |
$24,388
468,096
kWh
|
$3,062
-
kW-mo/yr
|
$5,944
-
MMBtu
|
||
TOTAL IMPLEMENTED | $8,577 | $1,680 |
$7,262
139,385
kWh
|
$1,315
-
kW-mo/yr
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs