ITAC Assessment: ME0215
ITAC logo
ITAC Assessment: ME0215
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Oriented Strand Board
NAICS
n/a
SIC 2493: Reconstituted Wood Products
Sales Range $10
M
to 50
M
# of Employees 112
Plant Area 129,600
ft2
Annual Production 290,400
thousand feet
Production Hrs. Annual 8,712
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,451,746 31,491,208
kWh
Electricity Demand $390,478 49,054
kW-mo/yr
Electricity Fees $4,993 -
LPG $620,951 104,531
MMBtu
Fuel Oil #2 $42,808 8,981
MMBtu
Wood $312,251 439,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $42,953 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,773

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Other Liquid (non-haz) Savings
01 2.2136: Install / repair insulation on steam lines $9,522 $18,574 - - $9,522
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,349 $979 $6,352
127,198
kWh
$1,433
-
kW-mo/yr
$(-436.0)
-
MMBtu
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,413 $9,426 $4,472
89,390
kWh
$941
-
kW-mo/yr
- -
04 2.4221: Install compressor air intakes in coolest locations $3,285 $330 $3,285
65,651
kWh
- - -
05 2.1213: Direct warmest air to combustion intake $1,736 $1,233 - - $1,736
-
MMBtu
-
06 2.6121: Reduce hot water temperature to the minimum required $1,268 - $408
8,206
kWh
$860
-
kW-mo/yr
- -
07 2.4239: Eliminate or reduce compressed air usage $1,102 $1,308 $1,102
21,981
kWh
- - -
08 2.6212: Turn off equipment during breaks, reduce operating time $488 $215 $488
9,672
kWh
- - -
09 3.2123: Convert to high volume low pressure (hvlp) paint guns $12,790 $10,531 - - - $12,790
-
gal
TOTAL RECOMMENDED $42,953 $42,596 $16,107
322,098
kWh
$3,234
-
kW-mo/yr
$10,822
-
MMBtu
$12,790
-
gal
TOTAL IMPLEMENTED $3,773 $545 $3,773
75,323
kWh
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs