Assessment Year | 1997 |
---|---|
Principal Product | Oriented Strand Board |
NAICS |
n/a
|
SIC | 2493: Reconstituted Wood Products |
Sales Range | $10 M to 50M |
# of Employees | 112 |
Plant Area |
129,600
ft2
|
Annual Production | 290,400
thousand feet
|
Production Hrs. Annual | 8,712
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,451,746 | 31,491,208 |
kWh
|
$0.046 |
Electricity Demand | $390,478 | 49,054 |
kW-mo/yr
|
$7.96 |
Electricity Fees | $4,993 | - |
|
- |
LPG | $620,951 | 104,531 |
MMBtu
|
$5.94 |
Fuel Oil #2 | $42,808 | 8,981 |
MMBtu
|
$4.77 |
Wood | $312,251 | 439,474 |
MMBtu
|
$0.71 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $42,953 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,773 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.2136: Install / repair insulation on steam lines | $9,522 | $18,574 | - | - |
$9,522
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $7,349 | $979 |
$6,352
127,198
kWh
|
$1,433
-
kW-mo/yr
|
$(-436.0)
-
MMBtu
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,413 | $9,426 |
$4,472
89,390
kWh
|
$941
-
kW-mo/yr
|
- | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $3,285 | $330 |
$3,285
65,651
kWh
|
- | - | - | |
05 | 2.1213: Direct warmest air to combustion intake | $1,736 | $1,233 | - | - |
$1,736
-
MMBtu
|
- | |
06 | 2.6121: Reduce hot water temperature to the minimum required | $1,268 | - |
$408
8,206
kWh
|
$860
-
kW-mo/yr
|
- | - | |
07 | 2.4239: Eliminate or reduce compressed air usage | $1,102 | $1,308 |
$1,102
21,981
kWh
|
- | - | - | |
08 | 2.6212: Turn off equipment during breaks, reduce operating time | $488 | $215 |
$488
9,672
kWh
|
- | - | - | |
09 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $12,790 | $10,531 | - | - | - |
$12,790
-
gal
|
|
TOTAL RECOMMENDED | $42,953 | $42,596 |
$16,107
322,098
kWh
|
$3,234
-
kW-mo/yr
|
$10,822
-
MMBtu
|
$12,790
-
gal
|
||
TOTAL IMPLEMENTED | $3,773 | $545 |
$3,773
75,323
kWh
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Wood Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs