ITAC Assessment: SF0598
ITAC logo
ITAC Assessment: SF0598
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Bottled Wines
NAICS 312130: Wineries
SIC 2084: Wines, Brandy, and Brandy Spirits
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 80,000
ft2
Annual Production 340,000
units
Production Hrs. Annual 7,878
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $40,579 141,957
kWh
LPG $33,535 1,488
MMBtu
TOTAL YEARLY COSTS $74,114
RECOMMENDED SAVINGS* $44,296 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,662

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.2694: Use highest temperature for chilling or cold storage $10,131 - $10,131
35,436
kWh
02 2.7224: Reduce space conditioning during non-working hours $3,805 $1,551 $3,805
13,310
kWh
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,578 $9,707 $6,578
23,008
kWh
04 2.7495: Install replacement doors $14,412 $27,546 $14,412
50,408
kWh
05 2.4226: Use / purchase optimum sized compressor $5,883 $23,100 $5,883
20,576
kWh
06 2.2515: Use optimum thickness insulation $1,644 $7,257 $1,644
5,744
kWh
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,843 $8,505 $1,843
6,447
kWh
TOTAL RECOMMENDED $44,296 $77,666 $44,296
154,929
kWh
TOTAL IMPLEMENTED $21,662 $33,156 $21,662
75,769
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs