ITAC Assessment: WI0339
ITAC logo
ITAC Assessment: WI0339
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Power Conditioners
NAICS
n/a
SIC 3674: Semiconductors and Related Devices
Sales Range $10
M
to 50
M
# of Employees 170
Plant Area 107,120
ft2
Annual Production 1,045,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $51,255 1,472,743
kWh
Electricity Demand $48,768 3,933
kW-mo/yr
Electricity Fees $4,764 -
Natural Gas $15,418 3,781
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,468 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $4,934

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 2.3134: Shift from daytime to nighttime operation $3,909 - - $3,909
-
kW-mo/yr
- - - - -
02 2.3132: Recharge batteries on during off-peak demand periods $245 $300 - $245
-
kW-mo/yr
- - - - -
03 3.5315: Lease / purchase baler; sell cardboard to recycler $2,824 $1,000 - - - - $2,824
-
lb
- -
04 2.7135: Install occupancy sensors $1,826 $2,400 $475
12,896
kWh
$1,351
-
kW-mo/yr
- - - - -
05 3.8142: Distill contaminated solvents for reuse $2,534 $4,000 - - - $1,320
-
gal
$(-131.0)
-
lb
$(-264.0) $1,609
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,865 $2,000 $883
24,033
kWh
$982
-
kW-mo/yr
- - - - -
07 2.7243: Improve air circulation with destratification fans / other methods $826 $2,600 $(-65.0)
(-1,758)
kWh
- $891
-
MMBtu
- - - -
08 2.7261: Install timers and/or thermostats $439 - - - $439
-
MMBtu
- - - -
TOTAL RECOMMENDED $14,468 $12,300 $1,293
35,171
kWh
$6,487
-
kW-mo/yr
$1,330
-
MMBtu
$1,320
-
gal
$2,693
-
lb
$(-264.0) $1,609
TOTAL IMPLEMENTED $4,934 $3,300 $883
24,033
kWh
$1,227
-
kW-mo/yr
- - $2,824
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs