ITAC Assessment: MI0356
ITAC logo
ITAC Assessment: MI0356
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Juices and beverages
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 160
Plant Area 220,000
ft2
Annual Production 4,250,000,000
units
Production Hrs. Annual 6,120
hrs
Location (State) Puerto Rico

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,190,476 6,691,875
kWh
Electricity Demand $187,429 21,984
kW-mo/yr
Electricity Fees $10,800 -
Fuel Oil #2 $297,068 15,428
MMBtu
Waste Disposal Costs
Water Usage $339,185 35,000
Tgal
TOTAL YEARLY COSTS $2,024,958
RECOMMENDED SAVINGS* $189,872 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $81,676

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Water Usage Savings
01 3.4159: Replace treated water with well / surface water $68,283 $118,050 - - - - $68,283
-
Tgal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,750 $42,002 $26,235
147,386
kWh
$2,515
-
kW-mo/yr
- - -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $25,615 $19,558 $19,417
109,082
kWh
$6,198
-
kW-mo/yr
- - -
04 2.2414: Use waste heat from hot flue gases to preheat $17,171 $24,418 - - - $17,171
-
MMBtu
-
05 2.1241: Reduce excessive boiler blowdown $10,928 $8,500 - - - $9,279
-
MMBtu
$1,649
-
Tgal
06 2.7221: Lower temperature during the winter season and vice-versa $8,814 $480 $8,047
45,208
kWh
$767
-
kW-mo/yr
- - -
07 2.1233: Analyze flue gas for proper air/fuel ratio $8,181 $2,320 - - - $8,181
-
MMBtu
-
08 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,569 $2,020 $6,904
38,788
kWh
$665
-
kW-mo/yr
- - -
09 2.9112: Use solar heat to heat water $7,502 $13,650 - - - $7,502
-
MMBtu
-
10 2.3212: Optimize plant power factor $7,059 $11,855 - - $7,059 - -
TOTAL RECOMMENDED $189,872 $242,853 $60,603
340,464
kWh
$10,145
-
kW-mo/yr
$7,059 $42,133
-
MMBtu
$69,932
-
Tgal
TOTAL IMPLEMENTED $81,676 $72,560 $60,603
340,464
kWh
$10,145
-
kW-mo/yr
- $9,279
-
MMBtu
$1,649
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Water Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs