Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

451

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Frozen fruit, juice, and vegetable manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SF0318 #03 Y:2005 Use photocell controls $1,174 $2,280
SF0318 #02 Y:2005 Install occupancy sensors $827 $4,059
SF0318 #01 Y:2005 Use photocell controls $5,334 $5,796
MI0113 #05 Y:2005 Insulate bare equipment $1,868 $975
MI0113 #04 Y:2005 Improve combustion control capability $5,163 $17,100
MI0113 #03 Y:2005 Insulate bare equipment $7,248 $1,138
MI0113 #02 Y:2005 Install vinyl strip / high speed / air curtain doors $9,230 $435
MI0113 #01 Y:2005 Lower temperature during the winter season and vice-versa $21,712 $52,535
OK0713 #07 Y:2005 Install occupancy sensors $561 $975
OK0713 #06 Y:2005 Utilize higher efficiency lamps and/or ballasts $1,489 $3,283
OK0713 #05 Y:2005 Utilize higher efficiency lamps and/or ballasts $33,796 $139,341
OK0713 #04 Y:2005 Add/modify equipment to improve drying process $48,000 $35
OK0713 #03 Y:2005 Use compressor air filters $5,346 $35
OK0713 #02 Y:2005 Analyze flue gas for proper air/fuel ratio $26,495 $85,051
OK0713 #01 Y:2005 Preheat boiler makeup water with waste process heat $81,171 $1,436
OR0478 #04 Y:2004 Modify refrigeration system to operate at a lower pressure $3,800 -
OR0478 #03 Y:2004 Use or replace with energy efficient substitutes $9,700 $49,100
OR0478 #02 Y:2004 Use most efficient type of electric motors $5,500 $1,900
OR0478 #01 Y:2004 Optimize plant power factor $11,420 $6,400
OR0459 #06 Y:2004 Optimize plant power factor $2,730 $5,130