ITAC Assessment: OR0459
ITAC logo
ITAC Assessment: OR0459
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Frozen Vegetables
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 193
Plant Area 311,000
ft2
Annual Production 150,000,000
lb
Production Hrs. Annual 2,080
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $716,741 20,287,360
kWh
Electricity Demand $219,800 49,010
kW-mo/yr
Electricity Fees $19,157 -
Natural Gas $167,716 32,786
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $61,380 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,880

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $4,500 $10,500 $4,500
143,400
kWh
- - -
02 2.2621: Modify refrigeration system to operate at a lower pressure $9,750 $300 $9,750
309,400
kWh
- - -
03 2.4224: Upgrade controls on compressors $4,820 $36,600 $4,200
133,000
kWh
$620
-
kW-mo/yr
- -
04 2.4133: Use most efficient type of electric motors $34,250 $2,000 $27,400
874,000
kWh
$6,850
-
kW-mo/yr
- -
05 2.1231: Establish burner maintenance schedule for boilers $5,330 $2,825 - - - $5,330
-
MMBtu
06 2.3212: Optimize plant power factor $2,730 $5,130 - - $2,730 -
TOTAL RECOMMENDED $61,380 $57,355 $45,850
1,459,800
kWh
$7,470
-
kW-mo/yr
$2,730 $5,330
-
MMBtu
TOTAL IMPLEMENTED $56,880 $46,855 $41,350
1,316,400
kWh
$7,470
-
kW-mo/yr
$2,730 $5,330
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs