Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Electric Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $10
M
to 50
M
# of Employees 300
Plant Area 150,000
ft2
Annual Production 7,800,000
pieces
Production Hrs. Annual 6,257
hrs
Location (State) Arkansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $247,462 3,347,597
kWh
Natural Gas $37,892 9,716
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,761 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,113

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $1,309 $1,740 $1,309
17,585
kWh
02 2.7142: Utilize higher efficiency lamps and/or ballasts $4,655 $648 $4,655
63,013
kWh
03 2.7111: Reduce illumination to minimum necessary levels $8,684 $890 $8,684
117,526
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,113 $100 $1,113
14,947
kWh
TOTAL RECOMMENDED $15,761 $3,378 $15,761
213,071
kWh
TOTAL IMPLEMENTED $1,113 $100 $1,113
14,947
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs