ITAC Assessment: SD0578
ITAC logo
ITAC Assessment: SD0578
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Bottled Water
NAICS 312112: Bottled Water Manufacturing
SIC 2086: Bottled and Canned Soft Drinks and Carbonated Waters
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 41,000
ft2
Annual Production 400,000
units
Production Hrs. Annual 4,650
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,487 788,624
kWh
Electricity Demand $117,299 3,128
kW-mo/yr
Electricity Fees $1,805 -
TOTAL YEARLY COSTS $211,591
RECOMMENDED SAVINGS* $2,218 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,933

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,296 $1,058 $702
5,989
kWh
$577
-
kW-mo/yr
$17
02 2.4231: Reduce the pressure of compressed air to the minimum required $307 $450 $307
2,617
kWh
- -
03 2.7135: Install occupancy sensors $285 $315 $285
2,448
kWh
- -
04 2.4133: Use most efficient type of electric motors $330 $816 $123
1,065
kWh
$207
-
kW-mo/yr
-
TOTAL RECOMMENDED $2,218 $2,639 $1,417
12,119
kWh
$784
-
kW-mo/yr
$17
TOTAL IMPLEMENTED $1,933 $2,324 $1,132
9,671
kWh
$784
-
kW-mo/yr
$17
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs