ITAC Assessment: MI0113
ITAC logo
ITAC Assessment: MI0113
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Bottled Juice
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 67,000
ft2
Annual Production 4,030
Tgal
Production Hrs. Annual 2,500
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $242,673 4,215,600
kWh
Electricity Demand $109,352 18,216
kW-mo/yr
Electricity Fees $57,173 -
Natural Gas $86,044 7,441
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $45,221 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,105

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $21,712 $52,535 $17,226
300,466
kWh
$4,486
-
kW-mo/yr
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $9,230 $435 $9,230
165,712
kWh
- -
03 2.2511: Insulate bare equipment $7,248 $1,138 - - $7,248
-
MMBtu
04 2.1116: Improve combustion control capability $5,163 $17,100 - - $5,163
-
MMBtu
05 2.2511: Insulate bare equipment $1,868 $975 $1,317
22,975
kWh
$551
-
kW-mo/yr
-
TOTAL RECOMMENDED $45,221 $72,183 $27,773
489,153
kWh
$5,037
-
kW-mo/yr
$12,411
-
MMBtu
TOTAL IMPLEMENTED $36,105 $70,070 $26,456
466,178
kWh
$4,486
-
kW-mo/yr
$5,163
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs