Assessment Year | 1994 |
---|---|
Principal Product | Rubber |
NAICS |
n/a
|
SIC | 3061: Molded, Extruded, and Lathe-Cut Mechanical Rubber Goods |
Sales Range | $10 M to 50M |
# of Employees | 260 |
Plant Area |
100,000
ft2
|
Annual Production | 0
units
|
Production Hrs. Annual | 7,200
hrs
|
Location (State) | Indiana |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $355,365 | 5,315,651 |
kWh
|
$0.067 |
Natural Gas | $74,192 | 14,389 |
MMBtu
|
$5.16 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,191 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,132 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $13,693 | $750 |
$13,693
204,865
kWh
|
- | - | |
02 | 3.4114: Replace city water with recycled water via cooling tower | $13,400 | $13,000 | - | - |
$13,400
-
Tgal
|
|
03 | 2.4133: Use most efficient type of electric motors | $6,176 | $5,530 |
$6,176
92,321
kWh
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,325 | $5,045 |
$5,325
79,719
kWh
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,350 | $200 | - |
$2,350
-
MMBtu
|
- | |
06 | 2.7135: Install occupancy sensors | $1,476 | $400 |
$1,476
21,981
kWh
|
- | - | |
07 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $890 | $500 | - |
$890
-
MMBtu
|
- | |
08 | 2.1213: Direct warmest air to combustion intake | $600 | $500 | - |
$600
-
MMBtu
|
- | |
09 | 2.8118: Check for accuracy of utility / power meters | $194 | - | - | - |
$194
-
Tgal
|
|
10 | 2.2531: Re-size charging openings or add movable cover or door | $87 | $40 | - |
$87
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $44,191 | $25,965 |
$26,670
398,886
kWh
|
$3,927
-
MMBtu
|
$13,594
-
Tgal
|
||
TOTAL IMPLEMENTED | $14,132 | $10,815 |
$11,501
172,040
kWh
|
$2,437
-
MMBtu
|
$194
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs