ITAC Assessment: OK0713
ITAC logo
ITAC Assessment: OK0713
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Canned fruit juice and drinks
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 269
Plant Area 465,000
ft2
Annual Production 227,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $514,592 14,496,128
kWh
Electricity Demand $229,215 27,343
kW-mo/yr
Electricity Fees $35,707 -
Natural Gas $926,610 150,982
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $196,858 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $161,012

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Increase in Production Savings
01 2.2441: Preheat boiler makeup water with waste process heat $81,171 $1,436 - - $81,171
-
MMBtu
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $26,495 $85,051 - - $26,495
-
MMBtu
- -
03 2.4227: Use compressor air filters $5,346 $35 $4,037
113,743
kWh
$1,309
-
kW-mo/yr
- - -
04 4.114: Add/modify equipment to improve drying process $48,000 $35 - - - - $48,000
05 2.7142: Utilize higher efficiency lamps and/or ballasts $33,796 $139,341 $34,604
974,778
kWh
$11,162
-
kW-mo/yr
- $(-11,970.0) -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,489 $3,283 $305
8,585
kWh
$99
-
kW-mo/yr
- $1,085 -
07 2.7135: Install occupancy sensors $561 $975 $561
15,808
kWh
- - - -
TOTAL RECOMMENDED $196,858 $230,156 $39,507
1,112,914
kWh
$12,570
-
kW-mo/yr
$107,666
-
MMBtu
$(-10,885.0) $48,000
TOTAL IMPLEMENTED $161,012 $86,557 $4,037
113,743
kWh
$1,309
-
kW-mo/yr
$107,666
-
MMBtu
- $48,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs