| Assessment Year | 2005 |
|---|---|
| Principal Product | Canned fruit juice and drinks |
| NAICS | 311411: Frozen Fruit, Juice, and Vegetable Manufacturing |
| SIC | 2037: Frozen Fruits, Fruit Juices, and Vegetables |
| Sales Range | $50 M to 100M |
| # of Employees | 269 |
| Plant Area |
465,000
ft2
|
| Annual Production | 227,000,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $514,592 | 14,496,128 |
kWh
|
$0.035 |
| Electricity Demand | $229,215 | 27,343 |
kW-mo/yr
|
$8.38 |
| Electricity Fees | $35,707 | - |
|
- |
| Natural Gas | $926,610 | 150,982 |
MMBtu
|
$6.14 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $196,858 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $161,012 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Increase in Production Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2441: Preheat boiler makeup water with waste process heat | $81,171 | $1,436 | - | - |
$81,171
-
MMBtu
|
- | - | |
| 02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $26,495 | $85,051 | - | - |
$26,495
-
MMBtu
|
- | - | |
| 03 | 2.4227: Use compressor air filters | $5,346 | $35 |
$4,037
113,743
kWh
|
$1,309
-
kW-mo/yr
|
- | - | - | |
| 04 | 4.114: Add/modify equipment to improve drying process | $48,000 | $35 | - | - | - | - | $48,000 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $33,796 | $139,341 |
$34,604
974,778
kWh
|
$11,162
-
kW-mo/yr
|
- | $(-11,970.0) | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,489 | $3,283 |
$305
8,585
kWh
|
$99
-
kW-mo/yr
|
- | $1,085 | - | |
| 07 | 2.7135: Install occupancy sensors | $561 | $975 |
$561
15,808
kWh
|
- | - | - | - | |
| TOTAL RECOMMENDED | $196,858 | $230,156 |
$39,507
1,112,914
kWh
|
$12,570
-
kW-mo/yr
|
$107,666
-
MMBtu
|
$(-10,885.0) | $48,000 | ||
| TOTAL IMPLEMENTED | $161,012 | $86,557 |
$4,037
113,743
kWh
|
$1,309
-
kW-mo/yr
|
$107,666
-
MMBtu
|
- | $48,000 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Ancillary Material Cost Savings | Increase in Production Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs