ITAC Assessment: OR0478
ITAC logo
ITAC Assessment: OR0478
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Dried & Frozen Apples
NAICS 311411: Frozen Fruit, Juice, and Vegetable Manufacturing
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $50
M
to 100
M
# of Employees 175
Plant Area 176,000
ft2
Annual Production 25,623
ton
Production Hrs. Annual 6,000
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $139,338 12,598,141
kWh
Electricity Demand $90,695 29,508
kW-mo/yr
Electricity Fees $12,388 -
Natural Gas $1,132,856 488,720
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,620

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.3212: Optimize plant power factor $11,420 $6,400 - - $11,420
02 2.4133: Use most efficient type of electric motors $5,500 $1,900 $3,600
327,100
kWh
$1,900
-
kW-mo/yr
-
03 2.4322: Use or replace with energy efficient substitutes $9,700 $49,100 $6,700
604,200
kWh
$3,000
-
kW-mo/yr
-
04 2.2621: Modify refrigeration system to operate at a lower pressure $3,800 - $3,800
343,000
kWh
- -
TOTAL RECOMMENDED $30,420 $57,400 $14,100
1,274,300
kWh
$4,900
-
kW-mo/yr
$11,420
TOTAL IMPLEMENTED $26,620 $57,400 $10,300
931,300
kWh
$4,900
-
kW-mo/yr
$11,420
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs