657
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Water supply and irrigation systems | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0633 #02 Y:2019 | 02 | 2019 | Use / purchase optimum sized compressor | $31,254 | $27,000 | |
| NC0633 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $2,586 | $6,135 | |
| IC0216 #04 Y:2019 | 04 | 2019 | Use solar heat to make electricty | $1,942 | $15,000 | |
| IC0216 #03 Y:2019 | 03 | 2019 | Use adjustable frequency drive or multiple speed motors on existing system | $2,900 | $3,585 | |
| IC0216 #02 Y:2019 | 02 | 2019 | Utilize controls to operate equipment only when needed | $1,893 | $2,460 | |
| IC0216 #01 Y:2019 | 01 | 2019 | Optimize plant power factor | $8,388 | $10,700 | |
| UA0208 #04 Y:2019 | 04 | 2019 | Change rate schedules or other changes in utility service | $102,952 | $150 | |
| UA0208 #03 Y:2019 | 03 | 2019 | Change rate schedules or other changes in utility service | $26,925 | $150 | |
| UA0208 #02 Y:2019 | 02 | 2019 | Use or replace with energy efficient substitutes | $18,684 | $35,725 | |
| UA0208 #01 Y:2019 | 01 | 2019 | Utilize higher efficiency lamps and/or ballasts | $7,648 | $9,245 | |
| IP0117 #04 Y:2019 | 04 | 2019 | Use solar heat to make electricty | $23,331 | $134,106 | |
| IP0117 #03 Y:2019 | 03 | 2019 | Replace existing chiller with high efficiency model | $3,315 | $17,500 | |
| IP0117 #02 Y:2019 | 02 | 2019 | Utilize higher efficiency lamps and/or ballasts | $7,275 | $9,350 | |
| IP0117 #01 Y:2019 | 01 | 2019 | Lower temperature during the winter season and vice-versa | $1,422 | $412 | |
| IP0116 #05 Y:2019 | 05 | 2019 | Use solar heat to make electricty | $117,376 | $1,431,096 | |
| IP0116 #04 Y:2019 | 04 | 2019 | Utilize higher efficiency lamps and/or ballasts | $6,878 | $14,599 | |
| IP0116 #03 Y:2019 | 03 | 2019 | Reduce the pressure of compressed air to the minimum required | $415 | $680 | |
| IP0116 #02 Y:2019 | 02 | 2019 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,151 | $23 | |
| IP0116 #01 Y:2019 | 01 | 2019 | Lower temperature during the winter season and vice-versa | $308 | - | |
| SF0536 #04 Y:2019 | 04 | 2019 | Use solar heat to make electricty | $78,553 | $677,569 |