ITAC Assessment: IP0116
ITAC logo
ITAC Assessment: IP0116
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Potable Drinking Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 6
Plant Area 1,540,170
ft2
Annual Production 5,794,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,712 9,560,242
kWh
Electricity Demand $56,317 22,313
kW-mo/yr
Electricity Fees $669 -
Natural Gas $16,476 2,143
MMBtu
TOTAL YEARLY COSTS $754,174
RECOMMENDED SAVINGS* $130,128 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $124,562

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $308 - - - $308
-
MMBtu
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,151 $23 $5,151
54,283
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $415 $680 $415
4,375
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $6,878 $14,599 $6,648
88,427
kWh
$230
-
kW-mo/yr
-
05 2.9114: Use solar heat to make electricty $117,376 $1,431,096 $117,376
1,566,266
kWh
- -
TOTAL RECOMMENDED $130,128 $1,446,398 $129,590
1,713,351
kWh
$230
-
kW-mo/yr
$308
-
MMBtu
TOTAL IMPLEMENTED $124,562 $1,445,695 $124,024
1,654,693
kWh
$230
-
kW-mo/yr
$308
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs