Assessment Year | 2000 |
---|---|
Principal Product | Roof Trusses |
NAICS |
n/a
|
SIC | 2452: Prefabricated Wood Buildings and Components |
Sales Range | $50 M to 100M |
# of Employees | 150 |
Plant Area |
126,031
ft2
|
Annual Production | 5,200
thousand feet
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Mississippi |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $30,585 | 598,769 |
kWh
|
$0.051 |
Electricity Fees | $13,777 | - |
|
- |
Natural Gas | $1,596 | 277 |
MMBtu
|
$5.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $22,365 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,672 | $327 |
$1,128
21,688
kWh
|
$544 | - | - | - | - | |
02 | 2.6212: Turn off equipment during breaks, reduce operating time | $303 | - |
$205
3,810
kWh
|
$98 | - | - | - | - | |
03 | 2.6214: Shut off pilots in standby equipment | $333 | $54 | - | - |
$333
-
MMBtu
|
- | - | - | |
04 | 2.6231: Utilize controls to operate equipment only when needed | $722 | $1,008 |
$487
9,379
kWh
|
$235 | - | - | - | - | |
05 | 3.5217: Reuse / recycle/ sell paper products | $18,776 | $38,510 |
$(-1,128.0)
(-14,654)
kWh
|
- | - |
$38,710
-
lb
|
$(-18,806.0) | - | |
06 | 4.821: Pay bills on time to avoid late fees | $559 | $453 | - | - | - | - | - |
$559
-
Tgal
|
|
TOTAL RECOMMENDED | $22,365 | $40,352 |
$692
20,223
kWh
|
$877 |
$333
-
MMBtu
|
$38,710
-
lb
|
$(-18,806.0) |
$559
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Fees Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs