ITAC Assessment: MS0157
ITAC logo
ITAC Assessment: MS0157
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Roof Trusses
NAICS
n/a
SIC 2452: Prefabricated Wood Buildings and Components
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 126,031
ft2
Annual Production 5,200
thousand feet
Production Hrs. Annual 2,080
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $30,585 598,769
kWh
Electricity Fees $13,777 -
Natural Gas $1,596 277
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,365 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,672 $327 $1,128
21,688
kWh
$544 - - - -
02 2.6212: Turn off equipment during breaks, reduce operating time $303 - $205
3,810
kWh
$98 - - - -
03 2.6214: Shut off pilots in standby equipment $333 $54 - - $333
-
MMBtu
- - -
04 2.6231: Utilize controls to operate equipment only when needed $722 $1,008 $487
9,379
kWh
$235 - - - -
05 3.5217: Reuse / recycle/ sell paper products $18,776 $38,510 $(-1,128.0)
(-14,654)
kWh
- - $38,710
-
lb
$(-18,806.0) -
06 4.821: Pay bills on time to avoid late fees $559 $453 - - - - - $559
-
Tgal
TOTAL RECOMMENDED $22,365 $40,352 $692
20,223
kWh
$877 $333
-
MMBtu
$38,710
-
lb
$(-18,806.0) $559
-
Tgal
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings Solid Waste (non-haz) Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs