ITAC Assessment: NC0633
ITAC logo
ITAC Assessment: NC0633
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Water and wastewater treatment
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 67
Plant Area 26,000
ft2
Annual Production 650,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $237,355 3,433,206
kWh
Electricity Demand $48,445 3,157
kW-mo/yr
Electricity Fees $3,115 -
TOTAL YEARLY COSTS $288,915
RECOMMENDED SAVINGS* $42,638 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,254

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $2,586 $6,135 $2,586
23,255
kWh
- -
02 2.4226: Use / purchase optimum sized compressor $31,254 $27,000 $23,517
367,920
kWh
$7,737
-
kW-mo/yr
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $920 $500 - $920
-
kW-mo/yr
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $6,540 $10,000 $6,540
58,814
kWh
- -
05 2.3212: Optimize plant power factor $1,338 $5,000 - - $1,338
TOTAL RECOMMENDED $42,638 $48,635 $32,643
449,989
kWh
$8,657
-
kW-mo/yr
$1,338
TOTAL IMPLEMENTED $31,254 $27,000 $23,517
367,920
kWh
$7,737
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs