Assessment Year | 2019 |
---|---|
Principal Product | Water and wastewater treatment |
NAICS | 221310: Water Supply and Irrigation Systems |
SIC | 4941: Water Supply |
Sales Range | $10 M to 50M |
# of Employees | 67 |
Plant Area |
26,000
ft2
|
Annual Production | 650,000
Tgal
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Virginia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $237,355 | 3,433,206 |
kWh
|
$0.069 |
Electricity Demand | $48,445 | 3,157 |
kW-mo/yr
|
$15.35 |
Electricity Fees | $3,115 | - |
|
- |
TOTAL YEARLY COSTS | $288,915 | |||
RECOMMENDED SAVINGS* | $42,638 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,254 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,586 | $6,135 |
$2,586
23,255
kWh
|
- | - | |
02 | 2.4226: Use / purchase optimum sized compressor | $31,254 | $27,000 |
$23,517
367,920
kWh
|
$7,737
-
kW-mo/yr
|
- | |
03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $920 | $500 | - |
$920
-
kW-mo/yr
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $6,540 | $10,000 |
$6,540
58,814
kWh
|
- | - | |
05 | 2.3212: Optimize plant power factor | $1,338 | $5,000 | - | - | $1,338 | |
TOTAL RECOMMENDED | $42,638 | $48,635 |
$32,643
449,989
kWh
|
$8,657
-
kW-mo/yr
|
$1,338 | ||
TOTAL IMPLEMENTED | $31,254 | $27,000 |
$23,517
367,920
kWh
|
$7,737
-
kW-mo/yr
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs