ITAC Assessment: MS0182
ITAC logo
ITAC Assessment: MS0182
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Upholstered Furniture
NAICS
n/a
SIC 2512: Wood Household Furniture, Upholstered
Sales Range $5
M
to 10
M
# of Employees 110
Plant Area 90,000
ft2
Annual Production 85,000
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $38,268 896,080
kWh
Electricity Demand $23,341 4,200
kW-mo/yr
Electricity Fees $3,367 -
Natural Gas $23,490 2,534
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $4,287 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,939

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $2,138 $2,205 - - $2,138 -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,201 $427 $1,183
35,600
kWh
- $18 -
03 2.6214: Shut off pilots in standby equipment $647 $54 - - - $647
-
MMBtu
04 2.4221: Install compressor air intakes in coolest locations $210 $195 $81
2,441
kWh
$126
-
kW-mo/yr
$3 -
05 2.7124: Make a practice of turning off lights when not needed $91 - $90
2,700
kWh
- $1 -
TOTAL RECOMMENDED $4,287 $2,881 $1,354
40,741
kWh
$126
-
kW-mo/yr
$2,160 $647
-
MMBtu
TOTAL IMPLEMENTED $1,939 $481 $1,273
38,300
kWh
- $19 $647
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs