Assessment Year | 2025 |
---|---|
Principal Product | Encapsulated Pills and Active Pharmaceutical Ingredients |
NAICS | 325412: Pharmaceutical Preparation Manufacturing |
SIC | 2834: Pharmaceutical Preparations |
Sales Range | $10 M to 50M |
# of Employees | 230 |
Plant Area |
42,506
ft2
|
Annual Production | 3,040,800
units
|
Production Hrs. Annual | 4,080
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $157,180 | 3,859,020 |
kWh
|
$0.041 | |
Electricity Demand | $127,172 | 7,557 |
kW-mo/yr
|
$16.83 | |
Electricity Fees | $52,205 | - |
|
- | |
Natural Gas | $35,108 | 6,582 |
MMBtu
|
$5.33 | |
Waste Disposal Costs | |||||
Water Usage | $13,375 | 1,003 |
Tgal
|
$13.33 | |
Water Disposal | $16,059 | 1,003 |
Tgal
|
$16.01 | |
TOTAL YEARLY COSTS | $401,099 | ||||
RECOMMENDED SAVINGS* | $98,012 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $19,980 | $20,761 |
$11,075
270,131
kWh
|
$8,905
-
kW-mo/yr
|
- | |
02 | 2.2622: Replace existing chiller with high efficiency model | $16,402 | $72,000 |
$7,739
188,760
kWh
|
$8,663
-
kW-mo/yr
|
- | |
03 | 2.4321: Upgrade obsolete equipment | $8,759 | $32,640 |
$10,265
250,370
kWh
|
$(-1,506.0)
-
kW-mo/yr
|
- | |
04 | 2.7425: Clean or color roof to reduce solar load | $5,567 | $9,248 |
$5,567
135,771
kWh
|
- | - | |
05 | 2.2694: Use highest temperature for chilling or cold storage | $3,591 | - |
$3,591
85,140
kWh
|
- | - | |
06 | 2.4224: Upgrade controls on compressors | $1,094 | $2,000 |
$1,094
26,676
kWh
|
- | - | |
07 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,019 | $2,949 |
$1,019
24,861
kWh
|
- | - | |
08 | 4.112: Replace old machine with new automatic multi-station tool | $41,600 | $88,000 | - | - | $41,600 | |
TOTAL RECOMMENDED | $98,012 | $227,598 |
$40,350
981,709
kWh
|
$16,062
-
kW-mo/yr
|
$41,600 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs