ITAC Assessment: UF0627
ITAC logo
ITAC Assessment: UF0627
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Encapsulated Pills and Active Pharmaceutical Ingredients
NAICS 325412: Pharmaceutical Preparation Manufacturing
SIC 2834: Pharmaceutical Preparations
Sales Range $10
M
to 50
M
# of Employees 230
Plant Area 42,506
ft2
Annual Production 3,040,800
units
Production Hrs. Annual 4,080
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $157,180 3,859,020
kWh
Electricity Demand $127,172 7,557
kW-mo/yr
Electricity Fees $52,205 -
Natural Gas $35,108 6,582
MMBtu
Waste Disposal Costs
Water Usage $13,375 1,003
Tgal
Water Disposal $16,059 1,003
Tgal
TOTAL YEARLY COSTS $401,099
RECOMMENDED SAVINGS* $98,012 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.3191: Use demand controller or load shedder $19,980 $20,761 $11,075
270,131
kWh
$8,905
-
kW-mo/yr
-
02 2.2622: Replace existing chiller with high efficiency model $16,402 $72,000 $7,739
188,760
kWh
$8,663
-
kW-mo/yr
-
03 2.4321: Upgrade obsolete equipment $8,759 $32,640 $10,265
250,370
kWh
$(-1,506.0)
-
kW-mo/yr
-
04 2.7425: Clean or color roof to reduce solar load $5,567 $9,248 $5,567
135,771
kWh
- -
05 2.2694: Use highest temperature for chilling or cold storage $3,591 - $3,591
85,140
kWh
- -
06 2.4224: Upgrade controls on compressors $1,094 $2,000 $1,094
26,676
kWh
- -
07 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,019 $2,949 $1,019
24,861
kWh
- -
08 4.112: Replace old machine with new automatic multi-station tool $41,600 $88,000 - - $41,600
TOTAL RECOMMENDED $98,012 $227,598 $40,350
981,709
kWh
$16,062
-
kW-mo/yr
$41,600
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs