Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Treated Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range less than $500
k
# of Employees 24
Plant Area 35,000
ft2
Annual Production 830,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $161,252 1,495,796
kWh
Electricity Demand $237,141 17,505
kW-mo/yr
TOTAL YEARLY COSTS $398,393
RECOMMENDED SAVINGS* $133,466 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,147

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,886 - - - $1,886 - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $5,261 $16,688 $4,861
41,377
kWh
- - $475 $(-75.0)
03 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $47,766 $327,497 $47,766
473,684
kWh
- - - -
04 2.9114: Use solar heat to make electricty $78,553 $677,569 $64,976
538,746
kWh
$13,577
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $133,466 $1,021,754 $117,603
1,053,807
kWh
$13,577
-
kW-mo/yr
$1,886 $475 $(-75.0)
TOTAL IMPLEMENTED $7,147 $16,688 $4,861
41,377
kWh
- $1,886 $475 $(-75.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs