ITAC Assessment: IP0117
ITAC logo
ITAC Assessment: IP0117
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Potable Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 5
Plant Area 595,250
ft2
Annual Production 6,700,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $426,567 9,734,400
kWh
Electricity Demand $370,352 20,349
kW-mo/yr
Electricity Fees $(-24,573.0) -
Natural Gas $9,091 1,647
MMBtu
TOTAL YEARLY COSTS $781,437
RECOMMENDED SAVINGS* $35,343 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,697

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,422 $412 $528
12,049
kWh
- $894
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,275 $9,350 $5,194
118,537
kWh
$2,081
-
kW-mo/yr
-
03 2.2622: Replace existing chiller with high efficiency model $3,315 $17,500 $1,909
43,554
kWh
$1,406
-
kW-mo/yr
-
04 2.9114: Use solar heat to make electricty $23,331 $134,106 $23,331
532,434
kWh
- -
TOTAL RECOMMENDED $35,343 $161,368 $30,962
706,574
kWh
$3,487
-
kW-mo/yr
$894
-
MMBtu
TOTAL IMPLEMENTED $8,697 $9,762 $5,722
130,586
kWh
$2,081
-
kW-mo/yr
$894
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs