Assessment Year | 1997 |
---|---|
Principal Product | PVC Pipe |
NAICS |
n/a
|
SIC | 3084: Plastics Pipe |
Sales Range | $50 M to 100M |
# of Employees | 120 |
Plant Area |
80,000
ft2
|
Annual Production | 90,000,000
lb
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $596,680 | 15,604,045 |
kWh
|
$0.038 |
Electricity Demand | $209,193 | 26,219 |
kW-mo/yr
|
$7.98 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $504,801 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $494,931 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,893 | $4,059 |
$2,163
56,858
kWh
|
$730
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,979 | $1,725 |
$7,979
156,506
kWh
|
- | - | |
03 | 2.5117: Convert to indirect temperature control system | $20,417 | $19,200 |
$20,417
390,094
kWh
|
- | - | |
04 | 2.2622: Replace existing chiller with high efficiency model | $11,382 | $32,000 |
$8,556
225,088
kWh
|
$2,826
-
kW-mo/yr
|
- | |
05 | 3.5212: Regrind, reuse, or sell scrap plastic parts | $9,870 | $31,000 | - | - | $9,870 | |
06 | 3.4145: Use magnetic technology to treat water | $11,000 | $43,500 | - | - | $11,000 | |
07 | 4.113: Install refrigeration system to cool product | $420,104 | $47,500 | - | - | $420,104 | |
08 | 2.8121: Apply for tax-free status for energy purchases | $21,156 | - | - | - | $21,156 | |
TOTAL RECOMMENDED | $504,801 | $178,984 |
$39,115
828,546
kWh
|
$3,556
-
kW-mo/yr
|
$462,130 | ||
TOTAL IMPLEMENTED | $494,931 | $147,984 |
$39,115
828,546
kWh
|
$3,556
-
kW-mo/yr
|
$452,260 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs