ITAC Assessment: OD0089
ITAC logo
ITAC Assessment: OD0089
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Virginia hams
NAICS
n/a
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $5
M
to 10
M
# of Employees 25
Plant Area 15,000
ft2
Annual Production 2,000,000
lb
Production Hrs. Annual 2,990
hrs
Location (State) Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $24,969 552,755
kWh
Electricity Demand $8,660 1,489
kW-mo/yr
Electricity Fees $180 -
LPG $9,449 1,749
MMBtu
Fuel Oil #2 $4,397 783
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $228

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $228 $8,826 $152
3,224
kWh
$76
-
kW-mo/yr
- -
02 3.3128: Utilize other methods to remove contaminants $10,166 $12,876 - - $10,166
-
gal
-
03 4.642: Install sensors to detect and avoid jams $1,325 $1,000 - - - $1,325
TOTAL RECOMMENDED $11,719 $22,702 $152
3,224
kWh
$76
-
kW-mo/yr
$10,166
-
gal
$1,325
TOTAL IMPLEMENTED $228 $8,826 $152
3,224
kWh
$76
-
kW-mo/yr
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs