ITAC Assessment: DL0098
ITAC logo
ITAC Assessment: DL0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Ink and Dye
NAICS 325910: Printing Ink Manufacturing
SIC 2893: Printing Ink
Sales Range less than $500
k
# of Employees 80
Plant Area 190,000
ft2
Annual Production 253,600
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,361 2,892,932
kWh
Natural Gas $27,659 2,360
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $112,247 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $111,547

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings
01 3.1222: Reduce water use with counter current rinsing $92,987 $22,000 - - $92,987
-
Tgal
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,900 $18,000 $2,900
46,500
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,100 $18,000 $2,100
34,000
kWh
- -
04 2.7442: Keep doors and windows shut when not on use $10,500 $19,500 $3,600
58,600
kWh
$6,900
-
MMBtu
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $3,060 $4,880 $3,060
39,340
kWh
- -
06 2.1242: Minimize boiler blowdown with better feedwater treatment $700 $500 - $700
-
MMBtu
-
TOTAL RECOMMENDED $112,247 $82,880 $11,660
178,440
kWh
$7,600
-
MMBtu
$92,987
-
Tgal
TOTAL IMPLEMENTED $111,547 $82,380 $11,660
178,440
kWh
$6,900
-
MMBtu
$92,987
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs