| Assessment Year | 2012 |
|---|---|
| Principal Product | Ink and Dye |
| NAICS | 325910: Printing Ink Manufacturing |
| SIC | 2893: Printing Ink |
| Sales Range | less than $500 k |
| # of Employees | 80 |
| Plant Area |
190,000
ft2
|
| Annual Production | 253,600
Tgal
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Delaware |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $179,361 | 2,892,932 |
kWh
|
$0.062 |
| Natural Gas | $27,659 | 2,360 |
MMBtu
|
$11.72 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $112,247 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $111,547 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings |
|---|---|---|---|---|---|---|---|
| 01 | 3.1222: Reduce water use with counter current rinsing | $92,987 | $22,000 | - | - |
$92,987
-
Tgal
|
|
| 02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,900 | $18,000 |
$2,900
46,500
kWh
|
- | - | |
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,100 | $18,000 |
$2,100
34,000
kWh
|
- | - | |
| 04 | 2.7442: Keep doors and windows shut when not on use | $10,500 | $19,500 |
$3,600
58,600
kWh
|
$6,900
-
MMBtu
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,060 | $4,880 |
$3,060
39,340
kWh
|
- | - | |
| 06 | 2.1242: Minimize boiler blowdown with better feedwater treatment | $700 | $500 | - |
$700
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $112,247 | $82,880 |
$11,660
178,440
kWh
|
$7,600
-
MMBtu
|
$92,987
-
Tgal
|
||
| TOTAL IMPLEMENTED | $111,547 | $82,380 |
$11,660
178,440
kWh
|
$6,900
-
MMBtu
|
$92,987
-
Tgal
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Water Disposal Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs