ITAC Assessment: GT0541
ITAC logo
ITAC Assessment: GT0541
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Ice Cream Cones
NAICS
n/a
SIC 2052: Cookies and Crackers
Sales Range $5
M
to 10
M
# of Employees 70
Plant Area 102,239
ft2
Annual Production 190,000,000
pieces
Production Hrs. Annual 5,600
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $105,168 1,518,171
kWh
Natural Gas $166,966 29,020
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $111,950 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $97,835

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.8113: Purchase gas directly from a contract gas supplier $66,555 $85,000 - - $66,555
02 2.5113: Use direct flame impingement or infrared processing for chamber type heating $31,280 $94,500 - $31,280
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $7,245 $5,000 - $7,245
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,910 $9,240 $3,910
56,565
kWh
- -
05 2.4133: Use most efficient type of electric motors $2,960 $17,150 $2,960
43,083
kWh
- -
TOTAL RECOMMENDED $111,950 $210,890 $6,870
99,648
kWh
$38,525
-
MMBtu
$66,555
TOTAL IMPLEMENTED $97,835 $179,500 - $31,280
-
MMBtu
$66,555
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs