Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Covered yarn
NAICS 313110: Fiber, Yarn, and Thread Mills
SIC 2281: Yarn Spinning Mills
Sales Range $5
M
to 10
M
# of Employees 60
Plant Area 137,500
ft2
Annual Production 780,000
lb
Production Hrs. Annual 8,400
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $308,774 8,509,050
kWh
Electricity Demand $169,897 14,940
kW-mo/yr
TOTAL YEARLY COSTS $478,671
RECOMMENDED SAVINGS* $31,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,714

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,633 $59,736 $4,276
117,787
kWh
$5,357
-
kW-mo/yr
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,983 $428 $1,972
54,302
kWh
$1,239
-
kW-mo/yr
$(-120.0) $(-108.0)
03 2.4226: Use / purchase optimum sized compressor $13,098 $50,000 $10,096
278,134
kWh
$3,002
-
kW-mo/yr
- -
04 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $2,107 $3,000 $1,456
40,110
kWh
$651
-
kW-mo/yr
- -
05 2.7241: Install outside air damper / economizer on hvac unit $4,120 $5,000 $4,120
113,493
kWh
- - -
TOTAL RECOMMENDED $31,941 $118,164 $21,920
603,826
kWh
$10,249
-
kW-mo/yr
$(-120.0) $(-108.0)
TOTAL IMPLEMENTED $25,714 $110,164 $16,344
450,223
kWh
$9,598
-
kW-mo/yr
$(-120.0) $(-108.0)
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs