ITAC Assessment: MO0235
ITAC logo
ITAC Assessment: MO0235
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Portland Cement
NAICS
n/a
SIC 3241: Cement, Hydraulic
Sales Range $50
M
to 100
M
# of Employees 134
Plant Area 218,000
ft2
Annual Production 1,300,000
ton
Production Hrs. Annual 8,760
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $4,366,715 176,051,585
kWh
Electricity Demand $1,906,197 29,306
kW-mo/yr
Electricity Fees $5,934 -
Natural Gas $628,261 218,435
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,847,053 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,539

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
01 4.611: Begin a practice of predictive / preventative maintenance $1,364 $3,550 - - - - $1,364
02 2.3415: Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $2,950,000 $19,000,000 - - - $2,950,000 -
03 2.7132: Install timers on light switches in little used areas $4,256 $7,500 $4,256
183,177
kWh
- - - -
04 2.4133: Use most efficient type of electric motors $7,919 $17,073 $6,163
265,240
kWh
$1,756
-
kW-mo/yr
- - -
05 2.4314: Use synthetic lubricant $7,514 $2,827 $5,693
245,018
kWh
$1,821
-
kW-mo/yr
- - -
06 3.5216: Recycle nonferrous dust $876,000 $900,000 - - $876,000
-
lb
- -
TOTAL RECOMMENDED $3,847,053 $19,930,950 $16,112
693,435
kWh
$3,577
-
kW-mo/yr
$876,000
-
lb
$2,950,000 $1,364
TOTAL IMPLEMENTED $13,539 $28,123 $10,419
448,417
kWh
$1,756
-
kW-mo/yr
- - $1,364
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Administrative Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs