ITAC Assessment: AM0195
ITAC logo
ITAC Assessment: AM0195
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product integrated circuit testing equipment
NAICS
n/a
SIC 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 135
pieces
Production Hrs. Annual 2,528
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $217,878 3,679,074
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,420 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,440

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.3212: Optimize plant power factor $21,340 $21,050 $21,340
-
kWh
02 2.6212: Turn off equipment during breaks, reduce operating time $1,500 - $1,500
55,393
kWh
03 2.6218: Turn off equipment when not in use $980 - $980
35,170
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $330 $50 $330
12,309
kWh
05 2.7111: Reduce illumination to minimum necessary levels $4,590 $4,420 $4,590
43,669
kWh
06 2.7142: Utilize higher efficiency lamps and/or ballasts $680 $580 $680
7,034
kWh
TOTAL RECOMMENDED $29,420 $26,100 $29,420
153,575
kWh
TOTAL IMPLEMENTED $28,440 $26,100 $28,440
118,405
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs