| Assessment Year | 1993 |
|---|---|
| Principal Product | integrated circuit testing equipment |
| NAICS |
n/a
|
| SIC | 3825: Instruments for Measuring and Testing of Electricity and Electrical Signals |
| Sales Range | $10 M to 50M |
| # of Employees | 120 |
| Plant Area |
n/a
|
| Annual Production | 135
pieces
|
| Production Hrs. Annual | 2,528
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $217,878 | 3,679,074 |
kWh
|
$0.059 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $29,420 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $28,440 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings |
|---|---|---|---|---|---|
| 01 | 2.3212: Optimize plant power factor | $21,340 | $21,050 |
$21,340
-
kWh
|
|
| 02 | 2.6212: Turn off equipment during breaks, reduce operating time | $1,500 | - |
$1,500
55,393
kWh
|
|
| 03 | 2.6218: Turn off equipment when not in use | $980 | - |
$980
35,170
kWh
|
|
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $330 | $50 |
$330
12,309
kWh
|
|
| 05 | 2.7111: Reduce illumination to minimum necessary levels | $4,590 | $4,420 |
$4,590
43,669
kWh
|
|
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $680 | $580 |
$680
7,034
kWh
|
|
| TOTAL RECOMMENDED | $29,420 | $26,100 |
$29,420
153,575
kWh
|
||
| TOTAL IMPLEMENTED | $28,440 | $26,100 |
$28,440
118,405
kWh
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs