ITAC Assessment: SU0574
ITAC logo
ITAC Assessment: SU0574
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Automotive Components
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 225
Plant Area 272,000
ft2
Annual Production 15,000
units
Production Hrs. Annual 2,000
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $159,041 2,493,244
kWh
Electricity Demand $66,661 5,183
kW-mo/yr
Electricity Fees $256,730 -
Natural Gas $284,029 43,548
MMBtu
Other Gas $30,238 43,548
MMBtu
TOTAL YEARLY COSTS $796,699
RECOMMENDED SAVINGS* $147,832 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $4,628 - $4,628
72,308
kWh
- - -
02 2.8121: Apply for tax-free status for energy purchases $51,579 $65 - - - $51,579
03 2.7314: Reduce ventilation air $7,952 $1,996 $3,032
47,399
kWh
- $4,920
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $666 $525 $666
10,403
kWh
- - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $709 $658 - - $709
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $12,949 $14,332 $12,949
202,331
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $25,320 $30,020 $6,097
95,264
kWh
$7,351
-
kW-mo/yr
- $11,872
08 2.4322: Use or replace with energy efficient substitutes $316 $446 $131
2,042
kWh
$32
-
kW-mo/yr
- $153
09 2.7135: Install occupancy sensors $635 $1,545 $635
9,920
kWh
- - -
10 2.6211: Conserve energy by efficient use of vending machines $137 $376 $137
2,146
kWh
- - -
11 2.2136: Install / repair insulation on steam lines $62 $315 - - $62
-
MMBtu
-
12 2.2622: Replace existing chiller with high efficiency model $42,879 $221,101 $42,879
669,984
kWh
- - -
TOTAL RECOMMENDED $147,832 $271,379 $71,154
1,111,798
kWh
$7,383
-
kW-mo/yr
$5,690
-
MMBtu
$63,604
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs