Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

654

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Water supply and irrigation systems
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AS0503 #02 Y:2021 Reschedule plant operations or reduce load to avoid peaks $82,856 $1,837
AS0503 #01 Y:2021 Use solar heat to make electricty $316,547 $4,413,360
OK1038 #03 Y:2020 Install timers and/or thermostats $991 -
OK1038 #02 Y:2020 Use counter current rinsing to reduce waste water $24,443 $2,171
OK1038 #01 Y:2020 Install occupancy sensors $563 $1,944
OR0737 #05 Y:2020 Use or replace with energy efficient substitutes $3,820 $8,556
OR0737 #04 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $2,884 -
OR0737 #03 Y:2020 Use optimum size and capacity equipment $5,949 -
OR0737 #02 Y:2020 Use optimum size and capacity equipment $7,614 -
OR0737 #01 Y:2020 Use or replace with energy efficient substitutes $7,782 -
CL2011 #05 Y:2020 Reschedule plant operations or reduce load to avoid peaks $1,975 $400
CL2011 #04 Y:2020 Modify facility to avoid excess maintenance costs $7,830 $4,500
CL2011 #03 Y:2020 Turn off equipment during breaks, reduce operating time $587 -
CL2011 #02 Y:2020 Install occupancy sensors $1,997 $295
CL2011 #01 Y:2020 Utilize higher efficiency lamps and/or ballasts $4,964 $3,933
CL2010 #04 Y:2020 Modify facility to avoid excess maintenance costs $14,466 $4,500
CL2010 #03 Y:2020 Use adjustable frequency drive or multiple speed motors on existing system $114,467 $157,000
CL2010 #02 Y:2020 Install occupancy sensors $1,084 $656
CL2010 #01 Y:2020 Utilize higher efficiency lamps and/or ballasts $15,534 $13,514
OK1036 #05 Y:2020 Install timers and/or thermostats $283 $312