ITAC Assessment: CL2011
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product High quality Potable Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $50
M
to 100
M
# of Employees 16
Plant Area 92,000
ft2
Annual Production 7,527,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,057,800 14,150,340
kWh
Electricity Demand $181,957 35,185
kW-mo/yr
Waste Disposal Costs
Water Usage $1 10
Tgal
Water Disposal $1 10
Tgal
Solid Waste (non-haz) $50,000 200,000
lb
TOTAL YEARLY COSTS $1,289,759
RECOMMENDED SAVINGS* $17,353 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,353

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,964 $3,933 $4,367
58,419
kWh
$597
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,997 $295 $1,997
26,720
kWh
- -
03 2.6212: Turn off equipment during breaks, reduce operating time $587 - $587
7,849
kWh
- -
04 4.463: Modify facility to avoid excess maintenance costs $7,830 $4,500 - - $7,830
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,975 $400 - $1,975
-
kW-mo/yr
-
TOTAL RECOMMENDED $17,353 $9,128 $6,951
92,988
kWh
$2,572
-
kW-mo/yr
$7,830
TOTAL IMPLEMENTED $17,353 $9,128 $6,951
92,988
kWh
$2,572
-
kW-mo/yr
$7,830
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs