ITAC Assessment: AS0503
ITAC logo
ITAC Assessment: AS0503
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Potable Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range less than $500
k
# of Employees 37
Plant Area 2,400,000
ft2
Annual Production 14,700,000
Tgal
Production Hrs. Annual 7,656
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,060,409 18,049,877
kWh
Electricity Demand $363,972 38,616
kW-mo/yr
Electricity Fees $140,147 -
TOTAL YEARLY COSTS $1,564,528
RECOMMENDED SAVINGS* $516,487 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $431,439

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.9114: Use solar heat to make electricty $316,547 $4,413,360 $267,990
4,231,318
kWh
$48,557
-
kW-mo/yr
- -
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $82,856 $1,837 $47,223
-
kWh
$35,633
-
kW-mo/yr
- -
03 3.1191: Change procedures / equipment / operating conditions $35,467 $918 $14,041
237,983
kWh
- $(-8,638.0) $30,064
04 2.8114: Change rate schedules or other changes in utility service $27,634 $115 - $9,200
-
kW-mo/yr
- $18,434
05 3.1191: Change procedures / equipment / operating conditions $25,372 $918 $21,262
360,380
kWh
$4,110
-
kW-mo/yr
- -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $9,834 $5,555 $8,239
139,642
kWh
$1,595
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $9,147 $2,290 $9,147
155,037
kWh
- - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $7,438 $14,828 $6,068
102,709
kWh
$1,003
-
kW-mo/yr
- $367
09 2.7272: Install heat pipes / raise cooling setpoint $2,192 $434 $1,527
25,885
kWh
$665
-
kW-mo/yr
- -
TOTAL RECOMMENDED $516,487 $4,440,255 $375,497
5,252,954
kWh
$100,763
-
kW-mo/yr
$(-8,638.0) $48,865
TOTAL IMPLEMENTED $431,439 $4,437,984 $326,747
5,227,069
kWh
$64,465
-
kW-mo/yr
$(-8,638.0) $48,865
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs