Assessment Year | 1994 |
---|---|
Principal Product | Military Electronic Hardware |
NAICS |
n/a
|
SIC | 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere |
Sales Range | $50 M to 100M |
# of Employees | 225 |
Plant Area |
230,000
ft2
|
Annual Production | 1,560
pieces
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $736,705 | 13,176,143 |
kWh
|
$0.056 |
Natural Gas | $175,927 | 44,382 |
MMBtu
|
$3.96 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $312,840 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $14,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $9,660 | $25,050 |
$9,660
172,040
kWh
|
- | |
02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,810 | $1,340 |
$3,810
68,288
kWh
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $42,860 | $189,480 |
$42,860
766,706
kWh
|
- | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $51,020 | $135,100 |
$51,020
1,318,288
kWh
|
- | |
05 | 2.7261: Install timers and/or thermostats | $10,800 | $13,300 |
$10,800
507,034
kWh
|
- | |
06 | 2.6231: Utilize controls to operate equipment only when needed | $5,120 | $250 |
$5,120
91,442
kWh
|
- | |
07 | 2.7272: Install heat pipes / raise cooling setpoint | $189,570 | $279,700 |
$81,460
1,456,624
kWh
|
$108,110
-
MMBtu
|
|
TOTAL RECOMMENDED | $312,840 | $644,220 |
$204,730
4,380,422
kWh
|
$108,110
-
MMBtu
|
||
TOTAL IMPLEMENTED | $14,780 | $25,300 |
$14,780
263,482
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs