ITAC Assessment: GT0526
ITAC logo
ITAC Assessment: GT0526
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product Military Electronic Hardware
NAICS
n/a
SIC 3699: Electrical Machinery, Equipment, and Supplies, Not Elsewhere
Sales Range $50
M
to 100
M
# of Employees 225
Plant Area 230,000
ft2
Annual Production 1,560
pieces
Production Hrs. Annual 2,000
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $736,705 13,176,143
kWh
Natural Gas $175,927 44,382
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $312,840 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,780

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $9,660 $25,050 $9,660
172,040
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,810 $1,340 $3,810
68,288
kWh
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $42,860 $189,480 $42,860
766,706
kWh
-
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $51,020 $135,100 $51,020
1,318,288
kWh
-
05 2.7261: Install timers and/or thermostats $10,800 $13,300 $10,800
507,034
kWh
-
06 2.6231: Utilize controls to operate equipment only when needed $5,120 $250 $5,120
91,442
kWh
-
07 2.7272: Install heat pipes / raise cooling setpoint $189,570 $279,700 $81,460
1,456,624
kWh
$108,110
-
MMBtu
TOTAL RECOMMENDED $312,840 $644,220 $204,730
4,380,422
kWh
$108,110
-
MMBtu
TOTAL IMPLEMENTED $14,780 $25,300 $14,780
263,482
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs