ITAC Assessment: CL2010
ITAC logo
ITAC Assessment: CL2010
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product High quality Potable Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $50
M
to 100
M
# of Employees 30
Plant Area 92,000
ft2
Annual Production 15,000,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) South Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,287 8,822,280
kWh
Electricity Demand $167,051 19,331
kW-mo/yr
Electricity Fees $2,909 -
LPG $60,000 12,000
MMBtu
Waste Disposal Costs
Water Usage $1 50,000
Tgal
Water Disposal $1 50,000
Tgal
Solid Waste (non-haz) $20,000 100,000
lb
TOTAL YEARLY COSTS $648,249
RECOMMENDED SAVINGS* $145,551 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $145,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $15,534 $13,514 $11,594
256,810
kWh
$3,940
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $1,084 $656 $1,084
24,011
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $114,467 $157,000 $61,614
1,364,795
kWh
$52,852
-
kW-mo/yr
-
04 4.463: Modify facility to avoid excess maintenance costs $14,466 $4,500 - - $14,466
TOTAL RECOMMENDED $145,551 $175,670 $74,292
1,645,616
kWh
$56,792
-
kW-mo/yr
$14,466
TOTAL IMPLEMENTED $145,551 $175,670 $74,292
1,645,616
kWh
$56,792
-
kW-mo/yr
$14,466
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs