ITAC Assessment: UD0150
ITAC logo
ITAC Assessment: UD0150
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1985
Principal Product SMALL WATER PUMPS
NAICS
n/a
SIC 3647: Vehicular Lighting Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 0
units
Production Hrs. Annual 2,100
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $79,537 847,011
kWh
Natural Gas $48,628 7,736
MMBtu
Fuel Oil #2 $11,278 1,820
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,291 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,006

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4323: Use optimum size and capacity equipment $2,440 - $2,440
24,033
kWh
-
02 2.7494: Install storm windows and doors $7,089 $4,000 $(-287.0)
(-2,052)
kWh
$7,376
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,196 $2,972 $3,732
35,756
kWh
$(-536.0)
-
MMBtu
04 2.7261: Install timers and/or thermostats $646 $140 $646
16,120
kWh
-
05 2.2437: Recover waste heat from equipment $702 $3,000 - $702
-
MMBtu
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,218 $1,360 $2,924
24,326
kWh
$(-706.0)
-
MMBtu
TOTAL RECOMMENDED $16,291 $11,472 $9,455
98,183
kWh
$6,836
-
MMBtu
TOTAL IMPLEMENTED $6,006 $4,500 $6,010
64,479
kWh
$(-4.0)
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs