ITAC Assessment: ME0286
ITAC logo
ITAC Assessment: ME0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Athletic Shoes
NAICS
n/a
SIC 3144: Women's Footwear, Except Athletic
Sales Range $10
M
to 50
M
# of Employees 375
Plant Area 127,785
ft2
Annual Production 1,600,000
pieces
Production Hrs. Annual 2,500
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $130,872 2,181,712
kWh
Electricity Demand $94,755 7,455
kW-mo/yr
Fuel Oil #2 $18,592 5,880
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,517 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $65,298

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 3.5217: Reuse / recycle/ sell paper products $46,375 - - - - - - $46,375
-
lb
-
02 2.8114: Change rate schedules or other changes in utility service $30,810 - - - $30,810 - - - -
03 2.1311: Replace electrically-operated equipment with fossil fuel equipment $7,566 $16,265 $9,431
160,023
kWh
- - - $(-1,865.0)
-
MMBtu
- -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $1,006 $1,750 $3,216
54,513
kWh
- - $(-2,210.0)
-
MMBtu
- - -
05 3.1191: Change procedures / equipment / operating conditions $3,750 $850 - - - - - - $3,750
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,736 $80 $3,736
62,427
kWh
- - - - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $2,865 $3,563 $1,569
26,084
kWh
$1,296
-
kW-mo/yr
- - - - -
08 2.2136: Install / repair insulation on steam lines $2,558 $1,844 - - - - $2,558
-
MMBtu
- -
09 3.2176: Increase use of automation $1,851 $2,515 $1,851
31,360
kWh
- - - - - -
TOTAL RECOMMENDED $100,517 $26,867 $19,803
334,407
kWh
$1,296
-
kW-mo/yr
$30,810 $(-2,210.0)
-
MMBtu
$693
-
MMBtu
$46,375
-
lb
$3,750
TOTAL IMPLEMENTED $65,298 $22,508 $17,952
303,047
kWh
$1,296
-
kW-mo/yr
- $(-2,210.0)
-
MMBtu
$(-1,865.0)
-
MMBtu
$46,375
-
lb
$3,750
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings LPG Savings Fuel Oil #2 Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs