ITAC Assessment: WV0643
ITAC logo
ITAC Assessment: WV0643
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Polyurethanes
NAICS 325212: Synthetic Rubber Manufacturing
SIC 2821: Plastics Materials, Synthetic Resins, and Nonvulcanizable Elastomers
Sales Range $50
M
to 100
M
# of Employees 74
Plant Area 186,508
ft2
Annual Production 95,000
ton
Production Hrs. Annual 4,290
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,354 1,384,344
kWh
Electricity Demand $38,773 3,675
kW-mo/yr
Natural Gas $19,187 2,316
MMBtu
LPG $10,601 217
MMBtu
Waste Disposal Costs
Water Usage $5,540 6,810
Tgal
Water Disposal $9,650 771
Tgal
TOTAL YEARLY COSTS $167,105
RECOMMENDED SAVINGS* $17,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,974

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings
01 2.7135: Install occupancy sensors $4,345 $8,691 $2,573
42,746
kWh
$1,772
-
kW-mo/yr
- - - -
02 3.4151: Minimize water usage $4,332 $20,664 $(-208.0)
(-3,452)
kWh
- - $277
-
Tgal
$4,263
-
Tgal
-
03 2.6232: Install set-back timers $3,513 $1,125 $884
14,687
kWh
$200
-
kW-mo/yr
$2,429
-
MMBtu
- - -
04 2.2511: Insulate bare equipment $1,534 $2,013 $1,028
17,073
kWh
$506
-
kW-mo/yr
- - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $966 $3,959 $(-29.0)
(-477)
kWh
- $995
-
MMBtu
- - -
06 2.4221: Install compressor air intakes in coolest locations $829 $2,567 $263
4,364
kWh
$127
-
kW-mo/yr
$439
-
MMBtu
- - -
07 2.4151: Develop a repair/replace policy $693 $671 $488
8,104
kWh
$243
-
kW-mo/yr
- - - $(-38.0)
08 2.4224: Upgrade controls on compressors $603 $1,520 $451
7,500
kWh
$152
-
kW-mo/yr
- - - -
09 2.4231: Reduce the pressure of compressed air to the minimum required $418 $100 $281
4,672
kWh
$137
-
kW-mo/yr
- - - -
10 2.4239: Eliminate or reduce compressed air usage $73 $215 $52
858
kWh
$21
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $17,306 $41,525 $5,783
96,075
kWh
$3,158
-
kW-mo/yr
$3,863
-
MMBtu
$277
-
Tgal
$4,263
-
Tgal
$(-38.0)
TOTAL IMPLEMENTED $12,974 $20,861 $5,991
99,527
kWh
$3,158
-
kW-mo/yr
$3,863
-
MMBtu
- - $(-38.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Usage Savings Water Disposal Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs