ITAC Assessment: KU0307
ITAC logo
ITAC Assessment: KU0307
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1990
Principal Product MOLDED PLASTIC PARTS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 55
Plant Area
n/a
Annual Production 400,000
lb
Production Hrs. Annual 2,168
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $93,091 813,013
kWh
Natural Gas $29,047 7,400
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $21,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,484

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,882 $1,861 $1,882
16,413
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $503 - $503
4,396
kWh
- -
03 2.4231: Reduce the pressure of compressed air to the minimum required $235 $50 $235
2,052
kWh
- -
04 2.6121: Reduce hot water temperature to the minimum required $140 - $101
879
kWh
$39
-
MMBtu
-
05 2.2212: Use minimum safe oven ventilation $4,979 $600 - $4,979
-
MMBtu
-
06 2.6214: Shut off pilots in standby equipment $250 - - $330
-
MMBtu
$(-80.0)
07 2.8114: Change rate schedules or other changes in utility service $13,730 $14,000 $13,730
-
kWh
- -
TOTAL RECOMMENDED $21,719 $16,511 $16,451
23,740
kWh
$5,348
-
MMBtu
$(-80.0)
TOTAL IMPLEMENTED $21,484 $16,461 $16,216
21,688
kWh
$5,348
-
MMBtu
$(-80.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs