Assessment Year | 2012 |
---|---|
Principal Product | Cryogenic Refrigeration Equipment |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $10 M to 50M |
# of Employees | 115 |
Plant Area |
42,248
ft2
|
Annual Production | 575
pieces
|
Production Hrs. Annual | 4,290
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $137,450 | 2,629,430 |
kWh
|
$0.052 |
Electricity Demand | $43,405 | 5,756 |
kW-mo/yr
|
$7.54 |
Electricity Fees | $6,874 | - |
|
- |
Natural Gas | $7,714 | 767 |
MMBtu
|
$10.06 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,369 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,325 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $164 | - |
$117
2,231
kWh
|
$47
-
kW-mo/yr
|
- | - | |
02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $5,399 | $1,890 | - |
$5,399
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $678 | $611 |
$678
12,972
kWh
|
- | - | - | |
04 | 3.1161: Eliminate/reduce an operation | $4,336 | $4,060 |
$(-63.0)
(-1,200)
kWh
|
$(-271.0)
-
kW-mo/yr
|
- | $4,670 | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,923 | $2,382 | - | - |
$1,923
-
MMBtu
|
- | |
06 | 2.6211: Conserve energy by efficient use of vending machines | $309 | $758 |
$309
5,904
kWh
|
- | - | - | |
07 | 4.431: Train operators for maximum operating efficiency | $13,560 | $54,280 | - | - | - | $13,560 | |
TOTAL RECOMMENDED | $26,369 | $63,981 |
$1,041
19,907
kWh
|
$5,175
-
kW-mo/yr
|
$1,923
-
MMBtu
|
$18,230 | ||
TOTAL IMPLEMENTED | $16,325 | $57,273 |
$795
15,203
kWh
|
$47
-
kW-mo/yr
|
$1,923
-
MMBtu
|
$13,560 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs