Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Analytical Equipment
NAICS 334516: Analytical Laboratory Instrument Manufacturing
SIC 3826: Laboratory Analytical Instruments
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 365,000
ft2
Annual Production 5,000
pieces
Production Hrs. Annual 5,356
hrs
Location (State) Delaware

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,353,527 14,946,454
kWh
Natural Gas $90,727 10,486
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $127,020 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $28,485

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7224: Reduce space conditioning during non-working hours $25,680 - $18,890
207,560
kWh
$6,790
-
MMBtu
02 2.6212: Turn off equipment during breaks, reduce operating time $2,550 - $2,550
28,050
kWh
-
03 2.7314: Reduce ventilation air $32,810 $1,560 $21,390
235,070
kWh
$11,420
-
MMBtu
04 2.2437: Recover waste heat from equipment $18,520 $65,650 $11,560
127,000
kWh
$6,960
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $21,525 $99,395 $21,525
236,545
kWh
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $25,935 $211,395 $25,935
284,990
kWh
-
TOTAL RECOMMENDED $127,020 $378,000 $101,850
1,119,215
kWh
$25,170
-
MMBtu
TOTAL IMPLEMENTED $28,485 $211,395 $28,485
313,040
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs