Assessment Year | 2012 |
---|---|
Principal Product | Metalized paper |
NAICS | 322220: Paper Bag and Coated and Treated Paper Manufacturing |
SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 70 |
Plant Area |
85,000
ft2
|
Annual Production | 700,000
thousand feet
|
Production Hrs. Annual | 8,568
hrs
|
Location (State) | Massachusetts |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,397,117 | 10,043,250 |
kWh
|
$0.14 |
Electricity Demand | $106,061 | 27,056 |
kW-mo/yr
|
$3.92 |
Electricity Fees | $4,800 | - |
|
- |
Natural Gas | $521,641 | 61,164 |
MMBtu
|
$8.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $83,776 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $43,573 | $24,000 |
$7,065
72,089
kWh
|
$36,508
-
MMBtu
|
|
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,554 | $33,000 |
$28,554
291,371
kWh
|
- | |
03 | 2.2511: Insulate bare equipment | $3,685 | $2,500 | - |
$3,685
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,509 | $200 |
$2,509
25,601
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $2,162 | $7,150 |
$2,162
22,058
kWh
|
- | |
06 | 2.4239: Eliminate or reduce compressed air usage | $1,145 | $3,183 |
$1,145
11,684
kWh
|
- | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,135 | $3,260 |
$1,135
11,580
kWh
|
- | |
08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,013 | $3,000 |
$1,013
10,340
kWh
|
- | |
TOTAL RECOMMENDED | $83,776 | $76,293 |
$43,583
444,723
kWh
|
$40,193
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs