ITAC Assessment: MA0692
ITAC logo
ITAC Assessment: MA0692
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Metalized paper
NAICS 322220: Paper Bag and Coated and Treated Paper Manufacturing
SIC 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 70
Plant Area 85,000
ft2
Annual Production 700,000
thousand feet
Production Hrs. Annual 8,568
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,397,117 10,043,250
kWh
Electricity Demand $106,061 27,056
kW-mo/yr
Electricity Fees $4,800 -
Natural Gas $521,641 61,164
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $83,776 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $43,573 $24,000 $7,065
72,089
kWh
$36,508
-
MMBtu
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,554 $33,000 $28,554
291,371
kWh
-
03 2.2511: Insulate bare equipment $3,685 $2,500 - $3,685
-
MMBtu
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,509 $200 $2,509
25,601
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $2,162 $7,150 $2,162
22,058
kWh
-
06 2.4239: Eliminate or reduce compressed air usage $1,145 $3,183 $1,145
11,684
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $1,135 $3,260 $1,135
11,580
kWh
-
08 2.2614: Use cooling tower or economizer to replace chiller cooling $1,013 $3,000 $1,013
10,340
kWh
-
TOTAL RECOMMENDED $83,776 $76,293 $43,583
444,723
kWh
$40,193
-
MMBtu
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs