ITAC Assessment: AM0610
ITAC logo
ITAC Assessment: AM0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Conveyors
NAICS 333922: Conveyor and Conveying Equipment Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 87
Plant Area 200,000
ft2
Annual Production 1,600
pieces
Production Hrs. Annual 4,723
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $94,172 1,782,951
kWh
Electricity Demand $40,206 6,336
kW-mo/yr
Electricity Fees $2,244 -
Natural Gas $34,046 6,476
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $65,600 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $50,385

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $28,900 $21,800 $21,600
407,600
kWh
$7,300
-
kW-mo/yr
- - -
02 2.7145: Install skylights $8,500 $2,560 $8,500
161,000
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,515 $1,500 $5,780
109,000
kWh
$1,735
-
kW-mo/yr
- - -
04 2.3212: Optimize plant power factor $6,000 $13,190 - $6,000
-
kW-mo/yr
- - -
05 2.8121: Apply for tax-free status for energy purchases $13,000 $1,300 - - - $2,600 $10,400
06 2.4314: Use synthetic lubricant $715 - $535
10,090
kWh
$180
-
kW-mo/yr
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $485 $275 $75
1,450
kWh
$15
-
kW-mo/yr
- $395 -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $485 $275 $75
1,450
kWh
$15
-
kW-mo/yr
$395 - -
TOTAL RECOMMENDED $65,600 $40,900 $36,565
690,590
kWh
$15,245
-
kW-mo/yr
$395 $2,995 $10,400
TOTAL IMPLEMENTED $50,385 $25,150 $27,530
519,500
kWh
$9,065
-
kW-mo/yr
$395 $2,995 $10,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Personnel Changes Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs