Assessment Year | 1998 |
---|---|
Principal Product | fibrous wood products |
NAICS |
n/a
|
SIC | 2499: Wood Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 20 |
Plant Area |
24,000
ft2
|
Annual Production | 30,000
ton
|
Production Hrs. Annual | 5,824
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $167,245 | 3,167,644 |
kWh
|
$0.053 |
Electricity Demand | $55,554 | 8,544 |
kW-mo/yr
|
$6.50 |
Natural Gas | $6,337 | 1,108 |
MMBtu
|
$5.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,470 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $31,519 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $7,409 | $10,225 |
$5,546
104,924
kWh
|
$1,863
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,330 | $2,729 |
$872
16,413
kWh
|
$458
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.7135: Install occupancy sensors | $831 | $599 |
$831
15,826
kWh
|
- | - | - | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $218 | $39 |
$168
2,345
kWh
|
$50
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $478 | $184 |
$358
6,741
kWh
|
$120
-
kW-mo/yr
|
- | - | - | - | |
06 | 3.1161: Eliminate/reduce an operation | $2,047 | $1,140 |
$(-229.0)
(-4,396)
kWh
|
$(-74.0)
-
kW-mo/yr
|
- |
$400
-
lb
|
$1,950 | - | |
07 | 4.112: Replace old machine with new automatic multi-station tool | $59,854 | $120,000 |
$29,361
556,272
kWh
|
$(-707.0)
-
kW-mo/yr
|
- | - | $31,200 | - | |
08 | 2.8211: Consolidate freight shipments and/or deliveries | $39,936 | $500 | - | - | - |
$(-10,400.0)
-
lb
|
$(-5,200.0) | $55,536 | |
09 | 2.8114: Change rate schedules or other changes in utility service | $11,040 | $50 | - | - | $11,040 | - | - | - | |
10 | 2.8113: Purchase gas directly from a contract gas supplier | $10,327 | $250 | - | - | $10,327 | - | - | - | |
TOTAL RECOMMENDED | $133,470 | $135,716 |
$36,907
698,125
kWh
|
$1,710
-
kW-mo/yr
|
$21,367 |
$(-10,000.0)
-
lb
|
$27,950 | $55,536 | ||
TOTAL IMPLEMENTED | $31,519 | $11,888 |
$5,843
109,614
kWh
|
$1,959
-
kW-mo/yr
|
$21,367 |
$400
-
lb
|
$1,950 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | By-product Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs