ITAC Assessment: MA0316
ITAC logo
ITAC Assessment: MA0316
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1994
Principal Product books, calendars, brochures
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 189
Plant Area 100,000
ft2
Annual Production 20,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $262,487 3,073,271
kWh
Natural Gas $48,688 8,834
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $31,901 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,669

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $21,512 $16,194 - $21,512
-
MMBtu
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $3,576 - $3,576
41,911
kWh
-
03 2.7313: Recycle air for heating, ventilation and air conditioning $1,905 $629 - $1,905
-
MMBtu
04 2.7224: Reduce space conditioning during non-working hours $1,618 $685 - $1,618
-
MMBtu
05 2.7135: Install occupancy sensors $1,426 $1,789 $1,426
16,706
kWh
-
06 2.3212: Optimize plant power factor $1,389 $2,700 $1,389
-
kWh
-
07 2.6231: Utilize controls to operate equipment only when needed $475 $312 $475
5,569
kWh
-
TOTAL RECOMMENDED $31,901 $22,309 $6,866
64,186
kWh
$25,035
-
MMBtu
TOTAL IMPLEMENTED $5,669 $997 $4,051
47,480
kWh
$1,618
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs