ITAC Assessment: UF0031
ITAC logo
ITAC Assessment: UF0031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product SHOES
NAICS
n/a
SIC 3143: Men's Footwear, Except Athletic
Sales Range $1
M
to 5
M
# of Employees 280
Plant Area
n/a
Annual Production 260,000
pieces
Production Hrs. Annual 2,300
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $42,408 848,183
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $8,293 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,293

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $68 $50 $68
1,465
kWh
02 2.7144: Install spectral reflectors / delamp $2,412 $42,465 $2,412
48,359
kWh
03 2.7142: Utilize higher efficiency lamps and/or ballasts $56 $5,370 $56
1,172
kWh
04 2.6232: Install set-back timers $672 $384 $672
13,482
kWh
05 2.7111: Reduce illumination to minimum necessary levels $4,501 - $4,501
89,977
kWh
06 2.4133: Use most efficient type of electric motors $155 $3,972 $155
3,224
kWh
07 2.4111: Utilize energy-efficient belts and other improved mechanisms $147 $125 $147
2,931
kWh
08 2.7233: Use properly designed and sized hvac equipment $282 $220 $282
5,569
kWh
TOTAL RECOMMENDED $8,293 $52,586 $8,293
166,179
kWh
TOTAL IMPLEMENTED $8,293 $52,586 $8,293
166,179
kWh
Yearly Savings* Imp'd Cost* Electricity Usage Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs